The Jimblebar mine site is located 39km east of Newman in WA. The project involved the supply and installation of earthing grid, conduit and stake installation system for the: train loadout; process water infrastructure; primary crusher and conveyors; overland conveyor; COS vault and tunnel structures; and power substations.
All work was delivered to BHP Billiton Iron Ore HSE and technical specifications and standards.