GCo were awarded a major electrical upgrade for CBH, scope was the upgrade of process critical electrical infrastructure, namely the trolley line supply of 500meters of 240mm 3c+e SWA and 250 meters of 300mm 4c+e SWA to MCC 7 supply upgrade through the existing operational Geraldton Port grain facility.
Critical works were required to be completed during a significant site shutdown.
Pre shut preparation was required to be completed on a working grain handling facility and collaboration with our client was critical to ensure safety and minimum plant downtime.