GCo were responsible for the design, supply, installation and commissioning of the 18kW Off Grid Solar PV and Battery Storage at Hamelin Bay Resort, Shark Bay. This system involved 60x 300W Polycrystalline Panels and 41kWh Battery Storage with a 12kVA Genset.